INSTANT CALL BACK

SENDING INQUIRY IN 1 MIN,
GETTING REPLY IN 2 HOURS.

FOCUS ON
OFFSHORE
INDUSTRY

GLEN MOORING

GLEN FLANGE is specialized in MOORING EQUIPMENT for offshore industrial since 2005 year, all workshops of GLEN are certified by LR class to guarantee quality as jetty level.

GLE old engineer made a contribution to jetty equipment for 15years. So, High-value consultancy, engineering and project-management services can be offered. Through our strategic partnerships with global suppliers to the offshore industry, Glen can offer the best in technology and engineering solutions, along with testing and follow-up services to ensure successful installation and ongoing results. We hope this brief introduction can help you to get outline understanding to us, for more detailed information, please do not hesitate to contact us.

Fender

Glen supplies variety of fenders including rubber fenders, foam fenders, pneumatic fenders and tug fenders. Our factory established its quality control system centralized in GB/T19001; 2001-IS09001:2000 and passed the UK AS certification of UK. Our products are widely used on bulk terminals, Oil and LNG facilities, container terminals, offshore platforms and multi-user berths around the global.

Quick Release Hook

Glen Quick release mooring hook designed to provide secure mooring points that facilitate the quick and safe release of mooting lines at oil, gas, LNG, chemical, iron. Coal and grain jetties. Standard range from 65 up to 200tons safe working load.

Gangway

GLEN access Technology is an expert in China at designing and fabricating client specific ship-to-shore access equipment with telescopic gangways, lift platforms, stores cranes and fire monitor columns, which provide a safe passage from ship to shore for the crew of all types of vessels in the petrochemical industry.

Mooring Bollards

Bollards designed by GLEN have a safety factor 1.5~3 times than working load. Raw material test and load test ensure our bollards are qualified. All bollards are well painted with epoxy primer & middle coat, and polyurethane topcoat against corrosion.

Marine Loading Arm

The Loading Arm is an equipment to load cryogenic liquid with our own intellectual property. The cryogenic swivel joint is of double flange type and very easy to change the main seal. Nitrogen purging system keeps the ball race dry and prevents the entry of moisture. The swivel joint is machined by CNC machine center and uses cryogenic main seal, with a very good sealability and meets the equirements of OCNIF and EU.

Disc Type Towing Hook

“Disc rotating freely until all rotation energy is discharged” Which is the biggest advantage compare to spring towing hook. So, No high release impact on foundation because of the free rotating disc system.
SWL from 5Tons to 120Tons.
Reset manual effort ≤ 15kgs.
Steel, nylon and polypropylene ropes can be used.
Manual release and Pneumatic remote control

OUR LATEST PROJECTS

OUR CERTIFICATES

All Glen work shop have been approved by class of LR, DNV-GL, ABS, BV,RINA,CCS, KR and NK. All test machine and testing laboratory have been approved by metrological certification under witness of surveyor.


HOW TO AVOID YOUR RISKS?

YOUR RISKS WE CONTROL AND TAKE

Unique serial number traced
As a ISO9001 quality certificate offshore system vendor, All components have been given a unique number which can be traced back to manufacturing and testing records.

Test guarantees

  • All test equipment have a valid calibration certificate.
  • All test methods will submitted to LR for approval.
  • All test data will forward to contractor with 24 hours after completion of test.

Shipping, handling ,storage &Installation guarantee
Glen prepare comprehensive shipping, handling, storage and installation procedures to ensure equipment from our factory to your site.

Training
Glen provide experienced service on-site representative for assembly,erection, testing and commissioning of the combined systems and train local operator and repairs and maintenance.

18 month Warranty
We undertake to remedy any defective components, caused by poor design, material or workman ship for the goods supplied.

Our liability is limited to replacing the defective parts, which appear within a period of 18 months from date of invoice, provided that our storage, installation, operating and maintenance manual is properly followed.

READY TO START A PROJECT WITH OUR TEAM OF PROFESSIONALS?

SENDING INQUIRY IN 1 MIN, GETTING REPLY IN 2 HOURS